FOR TORONTO HOMEOWNERS WHO WANT TO KNOW IF A PROJECT IS WORTH PURSUING BEFORE COMMITTING TO DESIGN FEES
Feasibility studies in Toronto – a direct go, modify, or reconsider recommendation before a dollar of design fees is spent.
Zoning analysis, existing condition assessment, realistic cost estimate including soft costs, and a direct recommendation. Not a list of considerations. A clear answer.
Free 15-Minute Consultation Call
✓
Go, modify, or reconsider — a direct recommendation, not a list of considerations
✓
Real cost estimate including soft costs consistently omitted from early budgets
✓
Zoning, existing conditions, and cost assessed together before design begins
Most project budgets are wrong before design begins. Most firms know this and say nothing.
- The firm that tells you the project is viable before assessing whether it is has an incentive to get the project started – not to give you an accurate picture of what it involves.
- The budget did not include soft costs – and the real total was 30 percent higher – Design fees, permit fees, development charges, engineering fees, temporary accommodation during construction, and contingency – consistently omitted from the early budget conversation because they are not the designer’s or the contractor’s cost and because including them makes the project look more expensive than the number that gets the project started. A homeowner who budgets $500,000 for a custom home in Toronto and discovers at the permit application stage that development charges alone add $100,000 has a project problem that a feasibility study would have identified on day one.
- The scope was committed before the existing conditions were assessed – A whole-home renovation budget based on a per-square-foot estimate for a comparable project in better condition. The knob and tube wiring that needed full replacement. The rubble stone foundation that required waterproofing before the basement could be finished. The structural conditions that added a beam and two columns to the scope. Each hidden condition added cost that a preliminary existing-condition assessment would have anticipated – not predicted exactly, but identified as probable and priced into the contingency before the scope was committed.
- The project proceeded because no one gave an honest recommendation not to – The lot coverage that was already exceeded before the addition was designed. The renovation cost that exceeded the after-improvement value of the property. The teardown that would have cost less to renovate than to demolish and rebuild. These are assessments that the firms a homeowner talks to early in a project rarely make – because making them means not getting the project. We make them when the assessment warrants them, because a homeowner who proceeds with a non-viable project spends more than one who redirected earlier.
A feasibility study that gives you a direct answer – including the answer you might not want to hear.
Sandra and Johanna graduated as architects in Venezuela and bring 10 years of construction experience across three countries. A proper feasibility study is an objective assessment of whether a project is viable — technically, financially, and legally — before major money is spent on design or construction.
Our assessment covers four areas:
Site and zoning — buildable envelope confirmed and variances identified if required.
Existing conditions — structure, mechanical, and envelope assessed for cost implications.
Cost estimate — realistic total project cost based on the actual scope and site conditions.
Recommendation — proceed, modify, or reconsider, with clear reasoning.
Because the same team conducts the feasibility study, design, and construction, the findings carry forward into the project without loss. The design that follows is based on a confirmed framework, not assumptions.
We hold the City of Toronto Building Renovator licence and supervise every project.
What a direct feasibility recommendation delivers
A go, modify, or reconsider recommendation before design fees are committed
Not a list of considerations. Not a report that documents uncertainty and leaves the decision to the homeowner without guidance. A direct recommendation based on the zoning analysis, the existing condition assessment, and the realistic cost estimate – with the reasoning stated clearly so the homeowner understands the basis for the recommendation and can make an informed decision.
A realistic total project cost including soft costs
Design fees, permit fees, development charges for new construction, engineering fees, temporary accommodation, and contingency – all included in the cost estimate. The number the project will actually cost, not the number that makes the project look achievable before the commitment is made. The gap between the early estimate and the real cost is where most project budget problems originate.
Design fees spent on a scope that has been confirmed as viable
The design that follows a feasibility study proceeds from a confirmed scope, a known cost range, and an understood set of constraints. Design decisions are made within a framework that has been tested against the zoning, the existing conditions, and the budget – not within a set of assumptions that may not survive the permit process or the construction estimate.
Testimonials
Elizabeth
North York
“Sandra’s design expertise and Johanna’s execution—flawless. They exceeded our expectations.“
Luma
Mississauga
“They delivered on time, stayed on budget, and cleaned up every day. Finally, a team that does what they promise.”
Ayesha
Richmond Hill
“Responsive, professional, punctual. They brought our vision to life even better than imagined.”
How We Work With You
Step 1 – Book a free 15-minute call
We talk about the project, the lot or existing building, and what you are trying to achieve. We give you an honest picture of what the feasibility assessment involves, what it will cover, and what it will cost.
Step 2 –
Site, zoning, condition, and cost assessment
We produce the complete permit drawing set – architectural drawings, structural coordination where required, and all supporting documents. We review the set against the city’s requirements and file a complete application on first submission.
Step 3-
Direct recommendation delivered
Go, modify, or reconsider — with the reasoning stated clearly and the specific adjustments identified if the recommendation is to modify. The homeowner leaves with a clear picture of what the project involves and a direct recommendation about whether to proceed.
10 Reasons Why Clients Choose Us
- We give a direct go, modify, or reconsider recommendation – not a list of considerations: A feasibility study that concludes with a list of factors to weigh has not done its job. We give a direct recommendation based on the zoning analysis, the existing condition assessment, and the realistic cost estimate – with the reasoning stated clearly. Go: the project is viable as proposed. Modify: viable with specific identified adjustments. Reconsider: unlikely to produce the intended outcome, with an explanation of what alternatives exist.
- We give reconsider recommendations when the assessment warrants them: Most firms do not tell a homeowner a project is not viable because telling them means not getting the project. We give reconsider recommendations when the zoning does not support the scope, when the cost significantly exceeds the budget with no obvious reduction that preserves the project’s value, or when the existing conditions make the renovation more expensive than the alternatives. A homeowner who proceeds with a non-viable project spends significantly more than one who redirected earlier.
- Soft costs are included in the cost estimate – every time: Design fees, permit fees, development charges for new construction, engineering fees, temporary accommodation during construction, and contingency – all included. These costs add 20 to 30 percent above the hard construction cost for a renovation and 25 to 35 percent for new construction. They are consistently missing from early project budgets. We include them because they are real costs the homeowner will pay regardless of whether they appear in the early estimate.
- Toronto development charges are disclosed before lot purchase or teardown commitment: Development charges for new residential construction in Toronto currently run $80,000 to $120,000 per unit. They are not negotiable, they apply before the first shovel of construction begins, and they are consistently absent from the early budget conversations homeowners have about new home construction. We include development charges in every new construction feasibility estimate – so the total project cost is known before the lot is purchased, not after the design fees are spent.
- Existing building conditions are assessed before renovation scope is committed The knob and tube wiring that needs full replacement. The rubble stone foundation that requires waterproofing before the basement can be finished. The structural conditions that add a beam and two columns to the scope. These are conditions that are discoverable before construction begins – through an honest preliminary assessment of the existing building. We assess them before the renovation scope is committed, so the cost implications are in the budget rather than in the change orders.
- The cost estimate reflects the specific project – not a published per-square-foot average: A per-square-foot renovation estimate averaged across a wide range of project types and conditions is not a cost estimate for your project. A Victorian semi requiring structural work, mechanical system replacement, and envelope repair costs more per square foot than a comparable renovation in a newer home in better condition. We estimate cost for the specific scope and the specific conditions – not from a benchmark that may not reflect what your project actually involves.
- Zoning constraints are confirmed before design fees are agreed: Lot coverage limit, setbacks, building height, Committee of Adjustment requirement, garden suite bylaw provisions – all confirmed for the specific lot before design fees are committed to a scope the zoning may not support. The design that follows a feasibility-validated scope is designed within a confirmed envelope. The design that proceeds without one may be redesigned at the permit stage, at a cost that is a multiple of the feasibility assessment.
- Architectural training and construction experience behind every assessment: Sandra and Johanna graduated as architects in Venezuela and have 10 years of construction experience across three countries. A feasibility assessment conducted by people who have designed and built the projects being assessed produces different findings from one conducted by analysts working from published benchmarks. The existing conditions that add cost are the ones visible to someone who has opened the walls of Toronto’s older homes. The zoning provisions that affect the project are the ones known to someone who has filed permit applications across Toronto’s neighbourhoods.
- Feasibility findings carry forward into design and construction without loss: The confirmed scope, cost range, and constraints identified in the feasibility study become the brief for the design. No handoff between the firm that assessed the project and the firm that designs it. The same team conducts the assessment, produces the design, manages the permit, and supervises the construction. The findings that informed the recommendation are the findings that inform every subsequent decision.
- The feasibility study costs less than one change order from a problem it would have identified: The most common objection to a feasibility study is the cost. The most common outcome of skipping one is a construction budget problem that costs a multiple of what the study would have cost to avoid. A whole-home renovation that discovers at framing that the mechanical systems need full replacement has a budget problem that a preliminary condition assessment would have identified. A new construction project that discovers at permit application that development charges add $100,000 to the total has a budget problem that a feasibility study would have disclosed before the lot was purchased.
What every Habitual Homes feasibility study includes
Site and zoning analysis
Building envelope confirmed, zoning constraints identified, Committee of Adjustment requirement flagged if applicable, and garden suite or secondary suite provisions assessed where relevant. What the lot allows, confirmed before design fees are committed.
Realistic total cost estimate including soft costs
Hard construction cost estimated for the specific scope and conditions. Design fees, permit fees, development charges, engineering fees, and contingency included. The total project cost the homeowner needs to budget for – not the number that makes the project look achievable before the commitment is made.
Architectural training and construction experience behind every assessment
Sandra and Johanna graduated as architects in Venezuela and have 10 years of construction experience. The feasibility assessment is conducted by people who have designed and built the projects being assessed – not by analysts working from published benchmarks.
Existing building condition assessment for renovation projects
Structural conditions, mechanical system status, envelope performance, and any conditions that add cost to the renovation scope assessed before the scope is committed. The gap between a per-square-foot estimate and the real project cost identified before it becomes a budget problem.
Go, modify, or reconsider recommendation
A direct recommendation based on the assessment findings. Go: the project is viable as proposed. Modify: the project is viable with specific identified adjustments. Reconsider: the project as proposed is unlikely to produce the intended outcome, with an explanation of what alternatives exist.
Feasibility findings carried forward into design and construction
The confirmed scope, cost range, and zoning constraints from the feasibility study become the brief for the design. No handoff between the firm that assessed the project and the firm that designs it. The same team conducts the assessment, produces the design, and supervises the construction.
Frequently Asked Questions
Q: What does a residential feasibility study actually assess?
A residential feasibility study assesses whether a proposed project is viable – given the site conditions, the zoning constraints, the existing building conditions, the estimated cost, the anticipated timeline, and the homeowner’s goals – before design fees are committed to the scope. It is the exercise that answers the question: should we proceed with this project, and if so, on what terms?
The assessment has four components. Site and zoning: what the lot allows, whether the proposed scope fits within the permitted envelope, and whether a Committee of Adjustment variance is required. Existing conditions: what the existing building contains that affects the project scope — structural conditions, mechanical systems, envelope performance, and any conditions that add cost to a renovation scope. Cost estimate: a realistic cost range for the proposed scope based on current Toronto construction costs, including soft costs that are consistently omitted from early project budgets. Recommendation: a direct go, modify, or reconsider recommendation based on the findings.
The deliverable is not a report that documents uncertainty – it is a clear picture of what the project involves and a direct recommendation about whether to proceed. A feasibility study that concludes with a list of considerations rather than a recommendation has not done its job.
Q: Why do most project budgets underestimate the real cost?
Most early project budgets underestimate the real cost for two reasons: soft costs are omitted, and the hard construction cost is estimated from published per-square-foot figures that do not reflect the specific conditions of the project.
Soft costs – design fees, permit fees, development charges for new construction, engineering fees, temporary accommodation during construction, moving costs, and contingency – typically add 20 to 30 percent above the hard construction cost for a renovation and 25 to 35 percent for new construction. These costs are real, they are predictable, and they are consistently missing from the early budget conversations that homeowners have with designers and contractors who are incentivised to get the project started rather than to give an accurate total.
Hard construction cost estimates from published figures – $300 per square foot for a renovation, $600 per square foot for new construction – are averages across a wide range of project types, specification levels, and site conditions. A renovation that requires significant structural work, mechanical system replacement, and envelope repair in addition to the finish scope costs significantly more per square foot than a renovation that is primarily cosmetic. A new construction project on a challenging infill lot with tight access and a complex structural condition costs more than a comparable project on a straightforward site.
A feasibility cost estimate accounts for the specific scope of the project – including the structural, mechanical, and envelope conditions that affect the hard cost, and the full range of soft costs that the total budget needs to absorb. It is not a number designed to get the project started. It is the number the project will actually cost.
Q: What does a go / modify / reconsider recommendation actually look like?
A go recommendation means the project is viable as proposed – the zoning supports the scope, the existing conditions do not add significant cost beyond what the scope already anticipated, the cost estimate is within the homeowner’s budget, and the timeline is acceptable. The project can proceed to design engagement with confidence that the scope is buildable, permittable, and affordable.
A modify recommendation means the project is viable with adjustments – the proposed scope exceeds the lot coverage limit by a margin that a reduced footprint could resolve, or the estimated cost exceeds the budget by an amount that a specification adjustment or a reduced scope could address, or the Committee of Adjustment requirement adds a timeline that changes the project’s viability for the household’s situation. The modification that makes the project viable is identified specifically, not generally.
A reconsider recommendation means the project as proposed is not viable – the zoning does not support the scope and the variance required is unlikely to be approved, or the estimated cost significantly exceeds the budget with no obvious reduction that preserves the project’s value, or the existing building conditions add costs that make the renovation more expensive than the alternatives. A reconsider recommendation is not a refusal to help – it is an honest assessment that proceeding would likely produce a worse outcome than the alternatives, and an explanation of what those alternatives are.
Most firms do not give reconsider recommendations because they are in the business of getting projects started. We give them when the assessment warrants them – because a homeowner who proceeds with a project that was not viable from the beginning spends significantly more than one who redirected earlier.
Q: When does a feasibility study make sense before a renovation?
A feasibility study makes sense before any renovation where the scope is large enough that getting it wrong is expensive – where the design fees, the construction cost, and the disruption of the project represent a significant commitment that deserves to be assessed before it is made.
For renovations specifically, the feasibility question is usually one of three: whether the proposed scope is achievable within the existing building’s structural and mechanical constraints without costs that exceed what the scope is worth; whether the lot coverage and zoning provisions support any additions to the building footprint that the scope involves; and whether the estimated cost is realistic given the specific existing conditions rather than a comparable project in better condition.
The renovations where feasibility assessment is most valuable are whole-home renovations of Toronto’s older housing stock – Victorian and Edwardian semis and detached homes where the existing conditions are variable, where the mechanical systems may be at end of life, and where the envelope performance may require significant investment to bring to a standard the renovation warrants. These are the projects where the gap between an early cost estimate and the real project cost is largest, and where the feasibility study investment produces the greatest return.
Q: When does a feasibility study make sense before new construction?
For new construction, a feasibility study is warranted before purchasing a lot or committing to a teardown – when the project viability depends on conditions that have not yet been confirmed. The zoning analysis that determines the permitted building envelope. The development charges that apply to new residential construction in Toronto and that add a significant cost that is consistently missing from early new construction budgets. The site conditions – access, topography, existing services – that affect the construction cost.
Toronto development charges for new residential construction currently run $80,000 to $120,000 per unit depending on the unit size and the applicable charges in the specific area. These charges are in addition to permit fees, design fees, and construction costs, and they are not negotiable. A homeowner who has budgeted for a custom home in Toronto without accounting for development charges has a budget gap of $80,000 to $120,000 that will become apparent at the permit application stage – at a point where the lot has been purchased, the design fees have been spent, and the only options are to find additional budget or to abandon the project.
A feasibility study before lot purchase or teardown commitment confirms the development charges, the zoning envelope, and the site conditions that affect the construction cost – so the total project budget is known before the commitment is made rather than discovered after it.
Q: What is the difference between a feasibility study and site planning?
Site planning focuses on the physical and regulatory constraints of the lot – what the zoning allows, what the site conditions permit, and what the building envelope looks like. It answers the question: what can be built on this lot? It does not assess cost, timeline, or whether the project is worth pursuing.
A feasibility study incorporates the site planning findings and adds the cost estimate, the timeline projection, the existing building condition assessment for renovations, and the go/modify/reconsider recommendation. It answers the broader question: should we build this, and on what terms? Site planning is a component of a feasibility study, not a substitute for it.
For projects where the primary unknown is the zoning – a homeowner who wants to know if a garden suite is possible on their lot before thinking about cost or design – site planning is the right starting point. For projects where the homeowner is weighing whether to proceed at all – evaluating a lot purchase, deciding between renovation and new construction, or assessing whether a major renovation budget is realistic – a full feasibility study is the appropriate scope.
Q: How does a feasibility study connect to the design-build process?
A feasibility study at Habitual Homes is the first stage of the design-build process for projects where viability needs to be confirmed before design fees are committed. The findings of the feasibility study – the confirmed zoning envelope, the existing condition assessment, the cost estimate, and the go/modify/reconsider recommendation – become the brief for the design that follows.
A project that proceeds from a feasibility study to design does so with the scope confirmed, the cost range established, and the zoning constraints understood. The design is developed within a confirmed framework rather than a set of assumptions that may not survive contact with the permit process or the construction estimate. The design fees spent on a feasibility-validated scope are design fees spent on a project that will get built.
Because the same team conducts the feasibility study and the design and construction, the findings are carried forward without loss. The existing conditions identified in the feasibility assessment inform the structural and mechanical strategy in the design. The cost estimate established in the feasibility study is the benchmark against which the construction documents are costed. There is no handoff between the firm that assessed the project and the firm that designs it.
Q: What areas of Toronto do you work in?
We provide feasibility studies across Toronto and the GTA – Leslieville, East York, Riverdale, the Beaches, the Danforth, Leaside, Rosedale, Forest Hill, Lawrence Park, Midtown, North York, Scarborough, Mississauga, and Richmond Hill.
Toronto’s specific construction cost conditions, development charge structure, zoning bylaw provisions, and older housing stock conditions are the context within which every feasibility assessment is conducted.
Not sure if we’re the right fit?
Let’s talk about your project and see if our approach aligns with what you’re looking for.
What happens on this call:
- You tell us about your space and goals
- We give you a quick assessment of what’s realistic
- We explain how we work and what happens next
- No obligation, no pressure
Feasibility studies are one of the services we offer as an architecture firm in Toronto.
Habitual Homes provides feasibility studies for homeowners in Toronto planning new home construction, major renovations, additions, and garden suites. Every feasibility study includes a zoning and site analysis, an existing building condition assessment for renovation projects, a realistic total cost estimate including soft costs consistently omitted from early project budgets, and a direct go, modify, or reconsider recommendation. Feasibility studies at Habitual Homes are conducted by the same team that will design and build the project if the recommendation is to proceed.
Renovation Feasibility Assessment in Toronto
Whole-home renovations of Toronto’s older housing stock – Victorian and Edwardian semis and detached homes – present the widest gap between early cost estimates and real project costs. Variable existing conditions, mechanical systems at end of life, envelope performance issues, and structural conditions that add scope beyond the finish renovation are consistently underestimated in early budgets. Habitual Homes assesses the existing building conditions before renovation scope is committed – identifying the conditions that add cost and incorporating them into a realistic total project estimate before design fees are spent.
New Construction Feasibility Assessment in Toronto
New home construction feasibility in Toronto involves confirming the zoning envelope, the development charges that apply to the specific project, the site conditions that affect construction cost, and the total project cost including all soft costs. Toronto development charges for new residential construction currently run $80,000 to $120,000 per unit and are consistently missing from early new construction budgets. Habitual Homes includes development charges, permit fees, design fees, and contingency in every new construction feasibility estimate.
Feasibility studies are one of the services we offer as an architecture firm in Toronto.
For projects where viability needs to be confirmed before design fees are committed, a feasibility study is the first stage of the Habitual Homes design-build process – conducted by the same team that will design and build the project if the recommendation is to proceed.